Adventist Hinsdale Hospital Case Study

Adventist Hinsdale Hospital
$60,682 in Energy Rebates

Adventist Hinsdale Testimonial - ACSI

  • Installed high efficiency burner replacement on a dual fuel boiler
  • The new burners cut (wasteful) excess air in half leading to a much higher combustion efficiency and have low NOx emission which is good for the environment
  • In addition, the high turndown burner’s low-fire operating range was reduced with the new burners.  This eliminated burner recycling with excessive purge cycles which also reduces operating costs
  • Incentive Amount: $60,682
  • Therms Saved: 60,000 Annually
  • Savings Equivalences: Saving 249 acres of pine forest, preventing 114 pounds of waste from going to the landfill, or reducing 64 vehicles off the road for an entire year.

Adventist Hinsdale Hospital – Chicago Engineer Testimonial Letter

Click to Enlarge

Adventist Hinsdale Testimonial - ACSI

acsigroup
Customer Solutions Delivered Clients come to ACSI for solutions for their piping, all types of boilers, equipment installations, emergency pipe combustion systems needs.Our experience and large parts inventory make it easy to mobilize and help you resolve unexpected downtime or leaks. We supply in-house maintenance staff trained to keep your systems running.
American Combustion Service, Inc.
S. Schoolhouse Rd
IL
19325
USA